An emissions inventory allows a company to be fully prepared for the monitoring plan, even before the official format is released.
Ordinance SEMC/MF No. 3,199/2026 (issued by the Extraordinary Secretariat for the Carbon Market of the Ministry of Finance) has set dates for the measurement, reporting and verification (MRV) obligations under the Brazilian Emissions Trading System (SBCE). However, it does not yet state the format in which companies will have to present their data. For this reason, those operating in a regulated sector must organise a reliable emissions inventory now, without waiting for the final regulation.
The practical problem is one of time and of evidence. Companies in Phase 1 must submit their monitoring plan as early as 2027. Moreover, their data history will later underpin the discussion on allowances. There is also a specific regime for air transport, which follows ANAC (the Brazilian Civil Aviation Agency). This article addresses these three points together.
What the ordinance already sets out and what is still missing
The Extraordinary Secretariat for the Carbon Market signed the act on 28 October 2026. Publication in the Federal Official Gazette took place on 29 October. The ordinance is grounded in Law No. 15,042/2024, which established the SBCE. Under Article 5, it has been in force since publication.
Article 2 sets a three-year sequence for each phase:
- first year (Y1): the company submits its monitoring plan to the managing body for review and approval;
- second year (Y2): the company measures emissions and removals throughout the year, in accordance with the approved plan;
- third year (Y3) and thereafter: measurement continues and the company files the verified report for the previous year.
Article 3 staggers the sectors. Phase 1 has Y1 in 2027. It covers aluminium, integrated steelmaking, cement, oil and gas and part of the chemical sector. It also includes iron ore and bauxite mining, pulp and paper and glass. Phase 2 has Y1 by 2029. It reaches ceramics, semi-integrated steelmaking, other chemical products, food and beverages, other minerals, refining and the electricity sector. Phase 3, in turn, has Y1 by 2031 and covers waterway, rail and road transport.
What is still missing, however, is essential for technical routines. The sole paragraph of Article 2 refers the minimum content, the format and the deadlines to a specific act of the managing body. That act must be issued at least one hundred and fifty days before each obligation begins. In practice, a company may have less than six months to adapt its data to the official model.
How to structure the emissions inventory before the specific act
The 150-day period is short for those starting from scratch. The internal emissions inventory therefore serves as preparatory work. It does not replace the monitoring plan, but it reduces rework once the official model is released.
First step: mapping facilities and activities
First, the company must list each establishment, its activities and its CNAE codes (the Brazilian classification of economic activities), both primary and secondary. Note “a” to the three annexes is decisive here. It requires consideration of the regulated activity carried out at the facility, even where it corresponds to a secondary CNAE code. Thus, a company whose primary registration falls outside the annexes may have a unit caught by its secondary activity.
Next: separating sources and defining the methodology
The inventory must then separate the emission sources of each facility. Combustion, industrial processes and own fleet usually require different methods. In addition, it is worth documenting emission factors, meters, reading frequency and the persons responsible. Article 3, paragraph 3, leaves it to the managing body to define the regulated sources, facilities and activities. For this reason, the inventory must be detailed enough to accommodate whatever scope is adopted.
Governance and evidence
Finally, the inventory requires an audit trail. In Y3, the company files a verified report, which presupposes traceable data from Y2 onwards. It is therefore advisable to define who collects, who reviews and where records are kept. In addition, it is prudent to provide, in contracts with energy and fuel suppliers, for a duty to deliver consumption data. Even so, the inventory should be tested against the statutory thresholds. The parameters referred to are 10,000 tCO₂e per year, for MRV purposes, and 25,000 tCO₂e, for periodic reconciliation.
Classification risks in the emissions inventory
Article 3, paragraph 2, contains the most important caveat. The presence of a CNAE code in the annexes does not, in itself, subject all activities under that code to the MRV obligations. In other words, the annex indicates the sector, but does not close off the regulated universe.
Iron and steel illustrate the risk well. Annex I covers only integrated plants, which reduce ore and produce liquid steel within the same complex. It also includes coke plants only where integrated into steelmaking. Annex II, in turn, covers semi-integrated plants, which produce steel from scrap and third-party pig iron. Two steelmakers with the same CNAE code may therefore fall into different phases.
In the chemical sector, the same logic applies. Phase 1 covers only certain products, such as ammonia, ethylene, nitric acid and carbon black. Other chemical products are left to Phase 2. The inventory must therefore record the product manufactured on each line, and not merely the CNAE code on the company’s registration.
The opposite risk also exists. A company may consider itself outside the system and discover, too late, that a secondary unit carries out a regulated activity. Meanwhile, the Y1 deadline is running. Law No. 15,042/2024 provides for offences and penalties under the SBCE, and non-compliance with MRV may trigger that regime.
Air transport: MRV through ANAC and the ProBioQAV
Air transport does not appear in any of the three phases. This does not mean exclusion, however. Article 4 provides that the sector must comply with the SBCE’s MRV requirements through the regulations of the National Civil Aviation Agency (ANAC). These are the measurement, reporting and verification rules of the National Sustainable Aviation Fuel Programme (ProBioQAV). That programme derives from Chapter III of Law No. 14,993/2024.
In practice, air operators will tend to use a single database for two regimes. On the other hand, the sole paragraph of Article 4 imposes two limits. First, the alignment must incorporate interoperability of information between ANAC and the SBCE managing body. Second, it does not waive the requirements of Law No. 15,042/2024 and of the SBCE regulations.
The emissions inventory of the aviation sector must therefore meet both fronts. Fuel consumption data and sustainable fuel use data serve the ProBioQAV. Even so, the airline must verify whether the SBCE will require additional information. Nor does the ordinance set out a timetable for aviation MRV.
From the MRV timetable to the National Allocation Plan
The ordinance does not set an emissions cap or distribute allowances. According to a note from the Federal Government released together with the act, it also does not create immediate costs. The cap and the allocation of Brazilian Emission Allowances depend on the National Allocation Plan, scheduled to begin in 2030.
Even so, the relationship between the two instruments is direct. Phase 1 delivers its first verified report in Y3, that is, in 2029, covering 2028 emissions. These figures are likely to form the historical basis for calibrating the cap and the allocation. A weak inventory today may therefore undermine a company’s position in the discussion on allocation.
For Phases 2 and 3, the text uses the expressions “by 2029” and “by 2031”. This wording appears to allow Y1 to begin earlier by decision of the managing body. Sectors in these phases therefore also stand to gain by starting their inventory early.
In addition, the Federal Government announced a public consultation, in November 2026, on the decree establishing the Brazilian MRV Programme. This is the next opportunity to comment on methodologies and formats.
In short, the concrete step is to begin with a map of facilities and CNAE codes, paying attention to secondary activities. It is then worth testing data collection over a full cycle before Y1. The open point remains the specific act of the managing body, which will set the format and the deadlines. Those who reach that stage with a completed inventory will only have to adjust the model, rather than build the foundations.
Read other legal news commented on by the firm and the articles by Moraes de Freitas Advogados.